← ControlPoint Manual

ControlPoint Manual — versioned with the code; every worked example below is a REAL corpus job and its numbers are pinned by the test suite.

Manual

The workflow (start here)

  1. 1 — Import: dump the fieldwork in
  2. 2 — Heights: HI/HT, rushed setups, trig heighting
  3. 3 — Control & vector check
  4. 4 — Adjust
  5. 5 — Read the report

Feature pages

The rule this manual lives by: no feature is done without its manual page. Every page tells you what the feature does, shows a worked example from a real job, and gives the one paragraph of theory a practising surveyor needs — no more.
Screenshot pending capture (needs a browser session) — the worked-example numbers on this page are from the real job and are pinned in tests.